Segment 4 (Lindale Bypass Route)

Length:
6.7 miles

Responsible Entity:
TxDOT

Project Type:
TOLL ROAD

From:
I-20

To:
US 69 North of Lindale

Initial Section:
2-Lane Undivided

Ultimate Section:
4-Lane Divided

Status:
Completed

Opened November 2018

Fact Sheet: Click to Download
EIS: Click to Download
Schematics: Click to Download
Draft EIS: Click to Download
Bidder Tabluation: Click to Download
Bridge Construction over I-20: Click to Download.

Toll 49 – Segment 4 was opened for traffic in November 2018. This project was originally developed by TxDOT as a relief route for the community of Lindale. Segment 4 extends from I-20 north to US 69 above Lindale.