North East Texas Regional Mobility Authority
Order your TxTag today!



PROJECT: Toll 49 Segment 7
Length: 20.4 miles

Responsible Entity: NET RMA

PROJECT TYPE: TOLL ROAD

FROM: IH 20 at Smith County Line
TO: US 259 in Longview
INITIAL SECTION: 2 – Lane Undivided
ULTIMATE SECTION: 4 – Lane Divided


OPENING DATE(S): STATUS

Segment 7: Not yet scheduled




Toll 49 SEGMENT 7:

The NET RMA, in conjunction with TxDOT, is evaluating the potential for Toll 49 Segment 7, which would form an outer loop around Longview, Texas. Toll 49 Segment 7 would begin at IH 20 at the Smith County Line and proceed to the north around Longview and terminate at US 259 in Longview, a distance of approximately 20.4 miles. Toll 49 Segment 7 is in conceptual planning and is a portion of the corridor defined as East Texas Hourglass (ETHG), which outlines a proposed road extending east of Tyler, around Longview, and over to US 59 above Marshall, Texas. Corridor studies and environmental studies must be completed before the alignment of this proposed roadway can be accurately established. Construction on this segment would likely take approximately four (4) years or more.



Toll 49 - Main Page

Toll 49 East Texas Hourglass

Segments 1-2

Segment 3A

Segment 3B

Segment 4

Segment 5

Segment 6

Segment 7

Segment 8

Segment 8A



Tyler Travel Survey Order your TxTag today! Order your TxTag today! Order your TxTag today!